| 1. | No disruption or length change of connected piping is required 不需要破坏或改变管道长度。 |
| 2. | Standard test method for length change calibration of thermomechanical analyzers 热机分析仪长度变化校正的标准试验方法 |
| 3. | Standard test method for length change of hardened hydraulic - cement , mortar , and concrete 硬化水凝水泥砂浆和混凝土长度变化的标准试验方法 |
| 4. | Methods of test for length change of mortar and concrete part 3 : method with dial gague 灰浆和混凝土长度变化的试验方法.第3部分:千分表检测法 |
| 5. | Methods of test for length change of mortar and concrete part 1 : method with comparator 灰浆和混凝土长度变化的试验方法.第1部分:比较器检测法 |
| 6. | Standard test method for length change of concrete due to alkali - carbonate rock reaction 由于碱金属碳酸盐矿石反应引起混凝土长度变化的标准试验方法 |
| 7. | Standard test method for determination of length change of concrete due to alkali - silica reaction 测定由于碱-硅石反应引起的混凝土长度变化的标准试验方法 |
| 8. | Standard test method for length change of hydraulic - cement mortars exposed to a sulfate solution 暴露在硫酸盐溶液中的水凝水泥砂浆长度变化的标准试验方法 |
| 9. | Methods of test for length change of mortar and concrete part 2 : method with contact - type strain gauge 灰浆和混凝土长度变化的试验方法.第2部分:接触式应变仪检测法 |
| 10. | The influence factors of length change of frp sheet and types of different frp sheet were taken into consideration 试验考虑的影响因素有:纤维布长度变化及纤维布种类变化。 |